From: route@monster.com
Sent: Sunday, May 01, 2016 7:44 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Dispatch Clerk
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
KIRAN PILLI Plano, TX 75025
USA | skiran999@gmail.com | Cell # 469-347-5223 SUMMARY: Seasoned
professional with 16+ years of national and international experience in the
mobile telecom industry. Extensive experience in Transport/Transmission
(Microwave Backhaul & Optical Fiber) in Network Planning & Design,
optimization, Implementation and Operations for GSM (2G), UMTS (3G) , WiMax
& LTE (4G) Small Cell and Wi-Fi networks. Specialties: ü
Cell
Site/BTS Services ü
Microwave
Backhaul Engineering Services ü
Optical
Fiber Access & Backbone Network Services ü
Project
Management ü
Technical
Training ü
Team
Management Mobile Technologies: GSM, CDMA, UMTS, EVDO, WiMax, LTE, Small
Cell, Wi-Fi, RAN, Mobile Transport (Microwave & Optical Fiber),
SDH/SONET, OSP, NMS, NOC, Granite/Xng, NRM, Clearvision, Business
Intelligence, Telecom / Data Analytics. Area of Expertise: IP Backhaul
Microwave: Planning &
Designing, Implementation and Operations - Licensed and Un-Licensed Radios. Licensed Radios: Minilink TN , LH
& PT – Ericsson, DragonWave, Ceragon, E-Band & BridgeWave, Flexi
Hopper – Nokia, Alcatel MDR 8000 & 4000, P-COM – Lucent, NEC, NERA,
Harris. Unlicensed Radios: Motorola PTP-600, Redline, Exalt, Proxim
Lynx SC, Adtran Tracer. Circuit
Provisioning: Experience in
Granite 6.3/XNG (T-Mobile Inc), Clearvision (Clearwire Inc), NRM (Sprint). Equipment Building, Circuit segments,
circuit paths, Mapping. Provisioning –
Leased Bandwidth Facilities: Experience in
Bandwidth Planning and forecasting - DS1, DS3, OC3. Network Maps: Working experience in preparation of
Network maps on MapInfo Professional and Visio Professional. Optical Fiber Backbone & Access
Projects: SDH/SONET (OC-3, OC-12, OC-48, OC-192) · Planning, Designing, optimizing, Implementation, Testing
and Operations. · Built Optical fiber backbone route around 6,000 Kilometers
and 110 ADM Backbone nodes. · Built NMS and Network Operation Center (NOC). · Generated SOW’s, MOP’s, BOM’s. · Working Knowledge of optical add/drop multiplexer (OADM)
systems, and reconfigurable optical add/drop multiplexer (ROADM) systems. Copper Plant: F2 Conditioning – Lightspeed Project. Testing: Tested Trans &
Receive Power, Bit Error Ratio, Jitter, Dynamic Range, Tandem Testing,
Mapping & De-mapping, Fiber Link test etc. Surveys: Done numerous site
surveys like Line of Sight (LOS), Redline, As-Built, Space & Power,
Surveys for Structure Analysis & Load Analysis. Professional
Career: Program Manager - Transport
Projects
Nov 2015 to Present TeleTech, Richardson, TX, USA Roles and Responsibilities: ·
Manage OSP
Fiber-to-the-Home design teams - Preliminary design, construction ride-outs,
quality control, make-ready engineering, and as-builts. ·
Plan and
maintain delivery schedules and project budgets. ·
Ensure that
the product meets a high level of quality, the specifications, and overall
satisfaction of the client. ·
Document and
implement scope changes as the project evolves. ·
Effectively
coordinate with the client, other sub-contractors, and phases involved in the
project. ·
Hiring and
training of new team members. Engineering Manager - Microwave Backhaul
Mar 2015 to Sep 2015
&
Fiber Solutions Nexius Inc, Allen, TX, USA Roles and Responsibilities: ·
Provide
Technical Sales support, complex Network roll-out, Services Delivery
excellence and Customer Network Support. ·
Life-cycle
and associated business processes; initiation (pre-sales support), through
planning, execution for network rollout and integration, and closing with
successful handover to customers. ·
Understanding
customer’s business needs and drives and translating that into network
solution offering that adds value to customer. Subject Matter Expert - RF/Microwave
Engineering Feb
2011 to Feb 2015 Ericsson Inc, Plano, TX, USA (Through
Nexius Inc) End Clients: Sprint (Network Vision -
LTE), metroPCS (4G LTE), LA-RICS (LTE) Roles and Responsibilities: Backhaul Solutions for Small Cell Project: ·
Evaluate
different back-haul solutions including Fiber, Copper, and Microwave based on
Total Time to Market (TTM) and Total Cost of Ownership (TCO). ·
Perform
Non-line of sight path calculations based on refraction and reflection
points. ·
Optimize
best small cell options for back-haul and work closely with RF team in
selection best candidate location for Small cell. Microwave Backhaul Solutions for LTE
Project: ·
Primary
responsibility for all aspects of backhaul design for LTE-based public-safety
broadband network for Los Angeles Regional Interoperable Communication System
Authority (LA-RICS), Los Angeles Market through Motorola Solutions Inc. ·
Created
strategies to effectively design and methodology of microwave backhaul
network. ·
Lead Responsibilities
in MW Backhaul Engineering Group - 14 Markets/12 States in US and 4,500+ LTE
sites for metroPCS LTE project. ·
Developed
design guidelines. ·
Delivered
customer facing presentations for network design solutions. ·
Managed and
trained a team of 34 design and support engineers to improve their efficiency
and meet design guidelines. ·
Developed
microwave designs, using licensed frequencies, which support the deployment
of next generation 4G wireless broadband network by utilizing software
propagation/planning tool PathLoss 5.0, along with defined design standards
and link budgets, to create high quality microwave designs for Sprint Network
Vision Project. ·
Reviewed and
redlined ZD drawings for zoning and leasing process. ·
FCC/ PCN for
microwave path licensing. ·
Built a
strong design architecture that maximizes performance, link availability, and
provides redundancy/diversity while also meeting budgetary objectives. ·
Worked
closely with market project managers and monitored progress and quality of
path surveys. ·
Effectively
managed design projects and any issues that arise to insure that they meet
aggressive deployment timelines Senior Microwave Design Engineer
Feb 2009 to Dec 2010 Clearwire Inc, Philadelphia, PA, USA.
(Through AWAT Inc) Project: WiMax (4G) Project. Roles and Responsibilities: ·
Designing
licensed microwave packet radio for transport and access rings for CLEARWIRE
WiMax 4G network for Philadelphia, Trenton and Wilmington Markets. ·
Optimizing
performance, link budget availability, and route diversity and redundancy for
licensed 11, 18, 23, and 80 GHz band frequencies using Pathloss 4.0 program. ·
Designing
different microwave topology using Pathloss 4.0 program. ·
Participate
in the search ring process for RF and microwave radio optimization. ·
Used vendor
selected licensed DragonWave Horizon Duo and E-Band Packet Radio for
Transport/Access rings. Motorola PTP 600, Redline Communications for spread
spectrum technology. ·
Reviewing
Line-of-Sight survey report from Nexius, WNG contractors. ·
Reviewing
and redlining ZD drawings for zoning and leasing process. ·
FCC/ PCN for
microwave path licensing. ·
Equipment
Building, Circuit segments, circuit paths, Mapping in Clearvision. Regional Microwave Engineer
Jun 2008 to Dec 2008 T-Mobile Inc, Bothell, WA, USA. (Through
WE DO ITT Inc) Project: UMTS (3G) Transport Planning,
Design & Circuit Provisioning. Roles and Responsibilities: ·
UMTS Network
Planning and Designing for Transport Network. ·
Designing
network layouts, plan, design & configure networks Backbone & Access
network planning as per organizational requirements and communication
protocols, Understating customer requirements and suggest suitable technical
solutions. ·
Microwave
path planning, design, and frequency co-ordination. · Generate SOW’s, MOP’s, BOM’s. ·
O&M
network planning. ·
Budgeting,
projection and application of equipment requirements. ·
Responsible
for maintaining accurate circuit records in the transport database/Granite. ·
Responsible
for maintaining the Equipment inventory in Granite database to sync up with
the switch. Senior Microwave Engineer
Oct 2007 to Apr 2008 Ericsson Inc, Plano, TX, USA (Through SLG
Compustaffing Inc) End Client: Sprint. Project: WiMax (4G)
Project. Roles and Responsibilities: ·
Designing
transport networks with point-to-point microwave for access backhaul design
using different topologies. ·
Checking the
Link and network reliability. ·
Path Design
including 99.999% propagation availability and end-to-end network
availability using terrain and clutter data. ·
Reviewing
the LOS Reports. ·
Redesigning
for blocked paths. ·
Preparation
of Bill-of-Materials. ·
Reviewing
Preliminary Microwave Plans, Line of Sight Survey reports. ·
Updated EBTS
with MW Hop details with frequencies used, Rx Level, Link Availability,
Antenna Dia, Polarization, Ant. Heights, and Azimuths. Design Engineer
Jun 2007 to Oct 2007 AT&T Inc, San Jose, CA, USA. (Through
SLG Compustaffing Inc) Project: Lightspeed (FTTH) Roles and Responsibilities: ·
Engineering
and construction of IP network. ·
Conditioning
the last mile of copper cable routing. ·
Preparation
of copper conditioning and Serving Area Interface retrofit construction
prints. ·
Redesigning
and manipulating existing copper plant. ·
Identification
of bridged taps. ·
Working
knowledge on ARES (AT&T plant records system). Site Auditor
Apr 2007 to Jun 2007 Ericsson Inc, Pleasanton, CA. (Through SLG
Compustaffing Inc) Project: GSM Sites Expansion with UMTS Roles and Responsibilities: ·
Verification
of survey reports for UMTS Expansion projects. ·
Coordination
with survey teams. ·
REWALK for
survey based on need. ·
Verification
of scope of work. ·
Checking the
space & power feasibilities. ·
Preparation
of bill of Materials /Quantities for site developments / expansions. Senior Engineer – Transmission Planning
& Projects
Mar 2004 to Mar 2007
Hutchison Essar South Limited, Hyderabad, India. (Now Vodafone, India) Project: Fiber Optic Planning &
Projects and Microwave Planning & Design (SDH - STM1/4/16/64), PDH (7/18/23),
TLP,TCL, Lease Lines, NMS, OMCT, Budgeting of Network, Forecast/ Projecting
of Bill of quantities and Materials of Network Elements for Roll out as per
Capex). Roles and Responsibilities:
·
Planning,
designing and implementation (installation, commissioning, testing and
integration of sites) of SDH transmission equipment. ·
Link budget
calculations. ·
Planning and
designing of traffic routing E1 droppings, A-bis and A interface. ·
Planning,
designing and finalization of ADM nodes and routes. ·
Preparation
of project estimations and preparing the note for approvals. ·
Diligently
managed the selection and implementation phases of contractors – ensuring all
work is performed within schedule / budget / and acceptable standards of the
network operation managers. ·
Working
knowledge of spreadsheets and numerical data manipulation. ·
Conducting
the surveys for space and power in existing sites for new SDH nodes. ·
Site
development for new SDH equipments. ·
Preparation
of the site documents before implementation and after implementation. ·
Conducting
the Red line surveys. ·
Preparation
of As-built drawings. ·
Conducting
the final acceptance test (FAT). ·
Involved in
Transmission AT with BSNL for POI connectivity’s. ·
Preparation
of spares list. ·
Resource
management. ·
Procurement
planning and execution for SDH Implementation. ·
Preparation
of reconciliation of materials. ·
Coordination
with NMS – OMCT department for managing the NE’s into NMS. ·
Liasioning
with third parties like TTSL, VSNL BTSOL, BSNL, Railtel and Reliance for
sharing, co-locations and lease bandwidth (LEC) etc – 2Mbps, DS3, STM-1. ·
Capex &
Opex preparation for OFC backbone project & Follow-up with Finance
department. ·
Coordination
with various contractors and monitor the project progress and quality. ·
Circuit
designing. · Extensively used Excel formulas and wrote macros to format
the data as per the business needs. · Responsible for the maintaining accurate circuit records
in the transport database and other systems for different Projects BSC
Re-homes, migrating. · Responsible for maintain the Equipment inventory in
database to sync up with the switch. Microwave Planning: Roles and Responsibilities: ·
Planning and
implementation of GSM service to remote areas by using long range
Point-to-Point microwave backhaul radios. ·
Performed
site selection/placement, tower height evaluation, antenna selection, output
power levels and other details involved with the transmission and reception
of cellular telephony. ·
Assisted
cell site technicians in turn up of new sites while recording initial
performance benchmarks; includes creation and utilization of test procedures
and equipment etc. ·
Involved in
installation, Testing, Commissioning & Integration of Access Network
(Mini-Link C/E, Flexihopper). ·
Revising
Preliminary Microwave Plans, Line of Sight Surveys for Accesses Network. ·
Conducting a
thorough microwave site survey for fixed point-to-point links, path profile analysis,
tower height design, repeater location, end-to-end connectivity for sites. ·
Capacity
Planning for Roll-outs and Expansion, BSC Re-Homing for various Sites from
time to time, with the help of tributary database having the details of the
cascaded sites. ·
Design and
Optimization of the A-BIS transmission Networks by calculating the Hi/Lo
Violation if any in the existing network from time to time and so as to
increase the Effective Fade Margin for the link and to meet the Link
Availability and Path Quality target based on ITU-T-REC.G.826. Telecom Engineer
Nov 2001 to Jun 2003 Seder Telecom, Kingdom of Saudi Arabia. Client: LM. Ericsson, Kingdom of Saudi
Arabia for GSME4, GSME5 Projects. Project #1Operation and Maintenance of
RBS2202/200 and Minilink C/E, P-COM, Harris access networks. Roles and Responsibilities: ·
Installation
and Commissioning of Ericsson GSM equipment like Radio Base Station RBS 2202,
2302 & Transmission equipment like Ericsson microwave Mini link E &
C, Other Microwave Equipments like P-Com, Harris & Nera. ·
Responsibility
for Operation & Maintenance of Radio Base Stations RBS 2202 & 2302
and Microwave equipment. ·
Daily
Maintaining BTS (RBS) 900/1800 cell sites. ·
Monitoring
of Breakdown of RBS /Access Network and within the Limits of Breakdown time
specified in O&M Manual. ·
Forwarding
Faulty Hardware with fault report from BTS (RBS) Cell sites & Access
Network to logistics Department for further action. ·
Interaction
with Vendors & Contractors for fault rectification and Other Maintenance
checks. Project #2Cell On Wheel - COW Special
Events ·
Involved in
relocation and installation of COW sites of GSM network in Kingdom of Saudi
Arabia. ·
Supervision
for the installation of IDU & ODU for Microwave Equipment of Minilink of
GSM network. ·
Installation
and Commissioning of Ericsson GSM equipment like Radio Base Station RBS 2202
& Transmission equipment, Ericsson microwave Mini link E. ·
Responsible
for Operation & Maintenance of Radio Base Stations RBS 2202 and microwave
equipment. Engineer – Transmission
Jun 2000 to Nov 2001 Bharti Telesonic Ltd., is a Bharti Group
of Companies licensed for National Long Distance (NLD) and International Long
Distance (ILD) services in India. Project:Optical Fiber Backbone Network in
Andhra Pradesh State. Roles and Responsibilities: ·
Conducted
OFC Route Surveys, Preparation of Survey Reports and Drawings. ·
Preparation
and Checking of Measurement Sheets and Preparation and Verification of Bills
for Construction
work.
·
Coordinating
with various contractors like L&T Ltd, ARM Ltd, PLL & TCIL and
sub-contractors, monitored project progress, and conducts inspection. ·
Construction
Supervising such as OF cable Trenching, Ducting, and Cable laying techniques,
Cable blowing and Installation of Manholes, Hand holes and Earth pits and
As-Built Drawings preparation. ·
Preparing
daily activity reports and submitting them to the Head – Transmission for
project assessment and information ·
Associated
in identifying ADM/REG sites, selection & acquisition, and negotiations
with the owners & associations. ·
Performed
Acceptance Tests of OFC Transmission Backbone Project. ·
Coordinating
with concerned Government departments for the acquisition of Right-Of-Way
Permissions. ·
Performed
testing of fiber links for jitter and BER before putting the traffic. ·
Testing
STM-1/STM-4 links using ANT-20 testers. Engineer
Jan 1998 to Jun 2000 Arya Communications & Electronics
Services Pvt. Ltd. Visakhapatnam, India. Tools Used: ·
Pathloss 4.0
& 5.0TEMS Link Planner 6.5.2TEMS Cell Planner ·
DeLorme Topo
USA 6.0MapInfo Professional 12.5Visio Professional ·
Clearvision
– database toolNRM(Sprint)Granite 6.3 ·
XpercomSiterraGoogle
Earth Pro ·
Nokia Flexi
hopper ManagerEricsson OMT SoftwareSite Master ·
Digital
Transmission AnalyzerBER Tester: ANT-20Splicing Machine ·
OTDR TesterFrequency
CounterVariable Attenuator ·
MS ExcelLaser
Rangefinder Hand-Held Compass ·
Garmin
e-Trex with WAAS enabled Training: ·
Fundamentals
of DragonWave Horizon DuoDragonWave, Philadelphia,USA ·
FiberAir
RFU-C MaintenanceCeragon, Philadelphia, USA ·
ARES
(AT&T plant records system)AT&T Inc, California, USA ·
Minilink
access networkHESL, Hyderabad, India ·
Installation
and Commissioning of Flexi hopperHESL, Hyderabad, India ·
Installation
and Commissioning of MW RadioHESL, Hyderabad, India ·
SDH/SONET Agilent
Technologies, Gwalior, India ·
STM-64/16/4/1ECI,
Mumbai, India ·
OTDR Agilent
Technologies, Gwalior, India ·
Splicing
Machine Agilent Technologies, Gwalior, India ·
GSM system
survey AIRTEL, Hyderabad, India ·
RBS
Maintenance (RBS 2202, 2206)HESL, Hyderabad, India Education: Graduation Bachelor of
Engineering in Electronics & Communication Engineering University
Osmania University, Hyderabad, India – (1991-1995)
Degree received in June 1995. Post-Graduation Master of Business
Administration in Marketing University
Andhra University, Visakhapatnam, India – (1995 – 1997)
Degree received in August 1997. Kiran
Pilli
Cell#469-347-5223
skiran999@gmail.com |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|